ESL Export Ltd were been awarded further repeat business with our valued customer Nestle at their Agbarra Facility in Nigeria.
Following an internal redesign of the production floor along with a fire safety audit of the new internal layouts it was necessary to compartment certain areas of the building with a 2 hour fire protection between production areas. ESL designed, supplied and installed Rockwool cored insulated wall panels to conform to this requirement which includes breaking out through the roof and providing further vertical compartmentation 1.5m above the roof line.
In addition ESL designed, supplied and installed acoustic wall cladding and door sets for the internal generator room upgrade.